Secure the drip edge with roofing cement.
Metal roof drip edge installation.
Step by step install drip edge on a metal roof build the lower rim of roof extended away from the fascia.
Fix the problem by installing sheet metal drip edge also called drip cap which is available at lumberyards and home centers.
The extension should be at least inch for it to work.
Where should drip edges be placed.
Make sure the outer edge extends over the gutter.
Points to the installation of ice and water shield along the lower roof eaves protecting against ice dam leaks that are common on un vented roofs in cold weather or snow climates.
How to install a drip edge.
Using drip edge with a nailing edge approx.
4 deep nail the drip edge to the sheathing every 16.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Most metal shingles will be attached to the roof using metal shingle.
The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Please like and subscribe for more instructional videos.
A drip edge is installed with an intended tilt which is specifically meant to direct water away from a roof while assuring the foundation of your roof is not exhausted prematurely by holes or fissures.
If it doesn t pull the drip edge out slightly from under the shingles.
Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.
Insert the wide flank of drip cap underneath the first course of shingle or tile all the.
Nail the drip edge to the roof sheathing at roughly 18 24 spacing intervals using roofing nails.